dc.contributor.author | AZIS, INCE MUTHIA PUTRI | |
dc.date.accessioned | 2023-03-10T07:18:33Z | |
dc.date.available | 2023-03-10T07:18:33Z | |
dc.date.issued | 2021 | |
dc.identifier.other | 45 16 041 153 | |
dc.identifier.uri | http://localhost:8080/xmlui/handle/123456789/5190 | |
dc.publisher | UNIVERSITAS BOSOWA | en_US |
dc.title | ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN INSTALASI PEMBUANGAN AIR LIMBAH KOTA MAKASSAR DENGAN METODE SLURRY DAN METODE AUGER BORTECH | en_US |
dc.type | Thesis | en_US |