ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN INSTALASI PEMBUANGAN AIR LIMBAH KOTA MAKASSAR DENGAN METODE SLURRY DAN METODE AUGER BORTECH

Show simple item record

dc.contributor.author AZIS, INCE MUTHIA PUTRI
dc.date.accessioned 2023-03-10T07:18:33Z
dc.date.available 2023-03-10T07:18:33Z
dc.date.issued 2021
dc.identifier.other 45 16 041 153
dc.identifier.uri http://localhost:8080/xmlui/handle/123456789/5190
dc.publisher UNIVERSITAS BOSOWA en_US
dc.title ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN INSTALASI PEMBUANGAN AIR LIMBAH KOTA MAKASSAR DENGAN METODE SLURRY DAN METODE AUGER BORTECH en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account