dc.description.abstract |
Sultan Hasanuddin International Airport experienced an average growth
in passengers and aircraft movements for the 2014-2018 period, respectively 11.35%
and 9.29% per year. Therefore, in order to improve service, airport development is
being carried out referring to the Sultan Hasanuddin Airport Master Plan, including
a parking building for 4-wheelers with a capacity of 624 SRP, while the existing 4-
wheeled parking capacity is 1,072 SRP. So that data was collected on the number of
passengers during peak hours, data on the number of vehicles and data on the
duration of each vehicle's parking in 2018 before the airport development was
carried out. From these data, a calculation of the need for parking space is carried
out during peak hours as well as a calculation of the availability and need for
parking space based on the length of time each vehicle is parked. So that the need for
parking space during peak hours is 1,183 SRP, and the required capacity based on
the characteristics of the length of time each vehicle is parked is 989 SRP/hour.
While currently being developed is 624 SRP with a capacity based on the long
parking characteristics of each vehicle is 522 SRP./hour. From the results of these
calculations it can be concluded that the development of stage 1 is not able to serve
parking needs during peak hours, so that additional parking space capacity is
needed. |
en_US |