Abstract:
The research is to identify and classify the levels of variables causes of delay
in implementation of the work of the port on the islands of Pangkep district and
describe Sailus relationship study of variable delay. This data processing
using the computer program SPSS (Statistical Product and Service Solution)
version 24.0. Data analysis techniques using descriptive test, test multiple
linear regression and correlation. The results of this study, namely the 8
variables obtained from the results of the extraction method litertur, interviews
and observations in the field but once processed through analysis of data then
only 5 variables that were declared to have contributions influence against the
delay in the project include: the use of ineffective time, availability of
equipment, supervision of the maximum, not the change of scope of work, and
a shortage of skilled labor as well as generate a linear regression equation
model to outlining the multiple strong relationships between variables in the
fifth over with the delay in the project.