ANALISIS SISTEM MOBILISASI BAHAN DAN PERALATAN (STUDI KASUS PADA PROYEK PEMBANGUNAN JALAN ASPAL DESA INULU PROVINSI SULAWESI TENGGARA)

Show simple item record

dc.contributor.author ERFAN
dc.date.accessioned 2023-01-05T06:16:16Z
dc.date.available 2023-01-05T06:16:16Z
dc.date.issued 2018
dc.identifier.other 4511041025
dc.identifier.uri http://localhost:8080/xmlui/handle/123456789/3693
dc.description.abstract The research is to identify and classify the levels of variables causes of delay in implementation of the work of the port on the islands of Pangkep district and describe Sailus relationship study of variable delay. This data processing using the computer program SPSS (Statistical Product and Service Solution) version 24.0. Data analysis techniques using descriptive test, test multiple linear regression and correlation. The results of this study, namely the 8 variables obtained from the results of the extraction method litertur, interviews and observations in the field but once processed through analysis of data then only 5 variables that were declared to have contributions influence against the delay in the project include: the use of ineffective time, availability of equipment, supervision of the maximum, not the change of scope of work, and a shortage of skilled labor as well as generate a linear regression equation model to outlining the multiple strong relationships between variables in the fifth over with the delay in the project. en_US
dc.publisher UNIVERSITAS BOSOWA en_US
dc.subject Influence of the contribution of the port en_US
dc.subject the Project delays and variable delay Project en_US
dc.title ANALISIS SISTEM MOBILISASI BAHAN DAN PERALATAN (STUDI KASUS PADA PROYEK PEMBANGUNAN JALAN ASPAL DESA INULU PROVINSI SULAWESI TENGGARA) en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account